MHI#16号機の1回目のEP2 Process log Status of working

Slides:



Advertisements
Similar presentations
esc/images/journal200404/index.html How the OFES (OGCM for the Earth Simulator) simulates the climatological state of the.
Advertisements

Introduction to New Media Development Association June 2001 このプレゼンテーションでは、出 席者間で討論をし、アクション アイテムを作成する場合があり ます。 PowerPoint を使ってプ レゼンテーションの実行中にア クション アイテムを作成する.
Localized hole on Carbon acceptors in an n-type doped quantum wire. Toshiyuki Ihara ’05 11/29 For Akiyama Group members 11/29 this second version (latest)
Optical inspection for PKU-4 after 2 nd V.T. 1 STF Cavity Group Meeting (2013/5/20) Kirk.
Report of recent DSSD status R. Kiuchi (SNU) 2012/10/20 E07
Magnetic Reconnection in the Magnetotail: Geotail Results
Process log Result of replica analysis Summary
小水力班/ Small Hydro Generation Group 研究背景 / Research background
STF Cavity Group Meeting (2012/6/25)
BT meeting (第3回) ‘04/May/11 N.Iida
第1回レポートの課題 6月15日出題 今回の課題は1問のみ 第2回レポートと併せて本科目の単位を認定 第2回は7月に出題予定
Ex7. Search for Vacuum Problem
Ex8. Search for Vacuum Problem(2)
2010年7月9日 統計数理研究所 オープンハウス 確率モデル推定パラメータ値を用いた市場木材価格の期間構造変化の探求 Searching for Structural Change in Market-Based Log Price with Regard to the Estimated Parameters.
熱中性子ラジオグラフィ用-新規LiFシンチレータ、
MHI #22 2nd Vertical Test Summary
2009年 3月 17日 法政大学 常盤祐司、児玉靖司、八名和夫、Ivan Ho、Billy Pham
The ball being captured inside the net
Performance Degradation in STF Cryomodules from STF-1 to STF-2
MEG実験2009 陽電子スペクトロメータの性能評価
RIKEN software meeting
S1-Global (Cryomodule設計状況)
Noun の 間(に) + Adjective Verb てform + いる間(に) during/while.
MHI#16号機の1回目の縦測定後の 局所研磨と3次元解析
SHIGENOBU HIROSE AND JULIAN H. KROLIK
HES-HKS & KaoS meeting Toshi Gogami 1Mar2013
SP0 check.
How do you talk about Positions/ Locations?
Tohoku University Kyo Tsukada
HES-HKS & KaoS meeting Toshi Gogami 31/Jan/2012.
著者:外岡秀行 著者:外岡秀行 著者:新井康平 著者:新井康平 著者:新井康平 著者:新井康平.
Measurement and Compensation of Lorentz Detuning at STF Phase-1.0
Group meeting 2016/5/13 Katsuhiro Umeda.
The future tense Takuya Mochizuki.
Cavity Group: E. Kako, T. Shishido, K. Umemori, T. Kubo, T. Konomi, G
Licensing information
Chapter 4 Quiz #2 Verbs Particles を、に、で
Possible Damping Ring Timing
CRLA Project Assisting the Project of
Second RF-Gun beamline
YMC Pro Series of ODS Columns
ストップウォッチの カード ストップウォッチの カード
Japanese 111 Instructor name.
Jig change over trolley for Shock Absorber Assembly Line
Photometric properties of Lyα emitters at z = 4
Report on the PHENIX by Yu Maruyama 5/6~5/30
WLTC Mode Construction
MeV internal meeting Oct. 2, 2015
Heat Exchanger Reliability Sealing Program
村岡和幸 (大阪府立大学) & ASTE 近傍銀河 プロジェクトチーム
研究会 「LHCが切り拓く新しい素粒子物理学」
RIKEN VTX software meeting
References and Discussion
表題差し換え.
著者:久世宏明. 著者:久世宏明 著者:久世宏明 著者:久世宏明 著者:久世宏明 著者:久世宏明.
著者:六川修一 著者:六川修一 原画像(左画像)は ©METI and JAXA[2007] Distributed by ERSDAC 著者:六川修一.
Ex7. Search for Vacuum Problem

SksMinus status 19 HB meeting 2009/2/06 白鳥昂太郎.
シミュレーションサマースクール課題 降着円盤とジェット
素核研、物理第4研究系、石山博恒 •Facility Plan • Research Subjects
HLab meeting 4/22/08 K. Shirotori.
Igor Petenko et al. Geophysical Research Abstracts Vol. 15, EGU , 2013
MO装置開発 Core part of RTR-MOI Photograph of core part.
SksMinus status 10 HB meeting 2008/8/01 白鳥昂太郎.
Measurements of J/ψ with PHENIX Muon Arms in 2003 p+p Collisions
Preflare Features in Radios and in Hard X-Rays
SksMinus status 13 HB meeting 2008/10/3 白鳥昂太郎.
Improving Strategic Play in Shogi by Using Move Sequence Trees
Goldscmidt2019, Barcelona, August 20, 2019
Presentation transcript:

STF Cavity Group Meeting @2011/3/28 MHI#16号機の1回目のEP2 Process log Status of working Monitor data during EP & Rinsing process Comparison of EP2 Period : 2011/3/7 ~ 3/11 Process : CP @flanges, EP2(20μm) under low current density, Improved 1st Water Rinsing, Brushing @HOM & Flange using FM-20, Degreasing(FM-20, 2%) [1hour], Brushing @Flange, HPR x 2 [10 hours], Assembly in C.R., Vacuum evacuation, Leak check, Baking @100℃ (48hours) Preparation : Washing vacuum components with ultrasonic, Cleaning in C.R. Workers : M. Sawabe, Kirk, M. Satoh (KEK), K. Nakamura, N. Tasaki, F. Tsukada (Assist Engineering Co.), T. Okada (K-VAC), M. Asano, S. Imada (Nihon Advanced Technology) STF Cavity Group Meeting @2011/3/28 Kirk

Condition of EP2 & Rinsing EP acid (2/23のサンプルを使用) Nb ingredient : 8.4g/ℓ HF ingredient : 28 g/ℓ (全体38g/ℓの65%が反応に使われる) Al ingredient : 15mg/ℓ Current density : ~37mA/cm2 (最近の傾向より) Cavity surface temperature : <35℃ Control Voltage : 温度と電流密度を見ながら制御 With normal N2 gas flow during extracting EP acid (8ℓ/min) 1st water rinsing (1.5hours) Improved version (25ℓ/minで20分間上下から流し続ける) 1分毎に1秒間水抜きを繰り返す(40分間) 最後の30分は10min (storing)/3min (flushing)で行う Degreasing (1 hour) FM-20(2%) HPR (~10 hours) 5h17m (6 turns, w/o blind flanges) 4h25m (5 turns, w/ blind flanges) EP2を1~2回行ったぐらいではたいして変化しない Brushing @HOM & Flange using FM-20 Brushing @Flange using FM-20 STF Cavity Group Meeting @2011/3/28

STF Cavity Group Meeting @2011/3/28 Process log ① 3/7 16:30 Check every flange surface several scratches were found at every flange on pick-up side They were removed by polishing mechanically 3/8 10:00 CP @flanges 10:30~ Attachment of jigs for EP 10:33 Check every flange [O.K.] / HPR operation starts without cavity 11:30 Set cavity to EP bed with crane 11:44 Installation of cathode bar to cavity [O.K.] Lunch time 13:00 Set data logger to cavity (totally 12ch) Leak check with N2 gas [O.K.] HPR operation stops for cleaning in HPR room 13:27 Meeting for tomorrow’s working procedure 14:00~ Vacuum parts rinsing with ultrasonic in C.R. 16:00 fin. STF Cavity Group Meeting @2011/3/28

STF Cavity Group Meeting @2011/3/28 Process log ② 3/9 9:45 Cavity rotation starts / EP acid flow starts 10:02 EP2 starts 11:08 EP2 stops [1h06m00s] / Idling rotation (3 rpm / 20min) / Plastic case detachment 11:28 Idling rotation stops 11:30 EP acid is removed from cavity with N2 gas flow(0.020MPa) 11:43 First rinsing with ultra pure water starts 11:48 Earthquake occurred! (Level 2 @Tsukuba) 13:13 First rinsing with ultra pure water stops [1h30m] 13:16 Detachment of restriction jigs / Data logger detached 13:36 Un-installation of cathode bar from cavity / washing cathode bar (No black mark) 13:44 transferring cavity from EP bed to wagon / Checking inside cavity [O.K.] 13:45 Detachment of jigs for EP / Detaching every blind teflon flange / Checking inside cavity [O.K.] 14:20 Brushing at every flange and HOM couplers using FM-20 / Shower rinsing 14:35 Checking inside cavity [O.K.] 14:38 Attachment of flanges for degreasing 14:46 Flowing FM-20 into cavity 14:50 Degreasing with ultrasonic starts 15:50 Degreasing with ultrasonic stops [1hour] 15:55 Removing FM-20 from cavity 16:00 Detachment of flanges for degreasing 16:06 Brushing at every flange using FM-20 / Shower rinsing STF Cavity Group Meeting @2011/3/28

STF Cavity Group Meeting @2011/3/28 Process log ③ 3/9 16:25 Transferring cavity from wagon on turntable for HPR using crane 16:32 Checking tolerance between position of nozzle and center of beam pipe 16:36 1st HPR for inside cavity starts 21:53 1st HPR for inside cavity stops [5h17m] (6 turns) 22:00 Attaching only top flanges in C.R. 22:15 fin. 3/10 9:00 Attachment of blind flanges at bottom beam pipe for 2nd HPR 9:18 HPR outside cavity with blind flanges starts [15mins] 9:36 2nd HPR for inside cavity with blind flanges starts 14:01 2nd HPR for inside cavity with blind flanges stops [4h25m] (5 turns) 14:05 Cavity enters into C.R. 14:30 Assembly in C.R. (Class 10) starts 15:40 Assembly in C.R. (Class 10) finishes / Moving out from Class10 to Class1000 15:50 Vacuum evacuation starts with heat guns 16:00 Turbo pump status 100% 16:20 Leak check thoroughly @~1.0x10-3Pa  Leak occurred at three ICF gaskets around bellows (Too low quality!!!)  Re-tightening screws / stop the leak / Re-leak check  O.K. 17:05 Baking @100℃ starts using new temperature controller Max Vacuum Level just after baking start : ~1.3 x 10-3Pa 18:00 Cavity vacuum : 7.13 x 10-4Pa @100℃/94℃/59℃/71℃/64℃/70℃/19℃ (Cell#3/Cell#7/Top/Bottom/Input/Probe/Room) 19:08 Cavity vacuum : 7.13 x 10-4Pa @100℃/94℃/59℃/71℃/64℃/70℃/19℃ STF Cavity Group Meeting @2011/3/28

STF Cavity Group Meeting @2011/3/28 Process log ④ 3/11 8:31 Cavity vacuum : 1.93 x 10-4Pa @100℃/105℃/93℃/104℃/101℃/94℃/18℃ (Cell#3/Cell#7/Top/Bottom/Input/Probe/Room) 13:10 Cavity vacuum : 7.02 x 10-5Pa @100℃/105℃/93℃/104℃/101℃/94℃/18℃ (Cell#3/Cell#7/Top/Bottom/Input/Probe) 14:46 Big earthquake occurs! Pumping system is broken! Give up V.T.! STF Cavity Group Meeting @2011/3/28

Status of 1st EP2 for MHI#16 ① voltage Tcavity Treservoir current Troom Tcavity 平均電流密度が37mA/cm2程度になるように電圧を調整する。 (low current density EP) average current density STF Cavity Group Meeting @2011/3/28

Status of 1st EP2 for MHI#16 ② 左図は平均電流密度と電圧の相関 右図は定常状態での分布 target STF Cavity Group Meeting @2011/3/28

STF Cavity Group Meeting @2011/3/28 最近の定常状態の比較 Cavity Mean temp. [℃] R.M.S. temp. [℃] Mean i [mA/cm2] R.M.S. i [mA/cm2] MHI-A 1st 26.1 0.8 36.5 1.5 MHI#12 1st 25.6 0.9 34.5 1.4 MHI#13 1st 26.9 37.4 MHI#12 2nd 26.2 0.5 36.3 MHI#13 2nd 26.6 0.7 37.6 1.6 MHI#14 1st 37.3 MHI#15 1st 27.9 36.2 MHI#14 2nd 29.0 38.0 1.2 MHI#15 2nd 28.1 MHI#16 1st 27.4 1.0 電流の振れ幅は前回並みである。 振れ幅はサチり始めているか・・・ STF Cavity Group Meeting @2011/3/28

Status of 1st EP2 for MHI#16 ③ #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group Meeting @2011/3/28 Steady state: 34.3 26.4 27.3 27.4 31.8 29.2 27.7 28.2 29.4 24.6 35.3 10.8

Status of 1st EP2 for MHI#16 ④ #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group Meeting @2011/3/28

STF Cavity Group Meeting @2011/3/28 Status of UWR for MHI#16 ① 通信不良によるデータの跳びは非常に少ない。 #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group Meeting @2011/3/28 Steady state: 15.5 14.4 13.8 13.4 14.4 13.4 13.5 13.8 14.3 12.8 14.7 17.0

STF Cavity Group Meeting @2011/3/28 Status of UWR for MHI#16 ② 一次洗浄中の空洞温度の状況(前ページの拡大図) #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group Meeting @2011/3/28

STF Cavity Group Meeting @2011/3/28 Status of UWR for MHI#16 ③ ① ①は最初の注水完了時。 ②は流量を増やした状態での洗浄中。 ③は流量を戻した状態での洗浄中。 ② ③ STF Cavity Group Meeting @2011/3/28

STF Cavity Group Meeting @2011/3/28 Status of HPR for MHI#16 ノズルは1st HPRでは6往復、2nd HPRでも5往復させた。 2回目はTOCメータが故障し、まともな数値を示していない。 Particleの傾向はどちらも良く似ている。 STF Cavity Group Meeting @2011/3/28

Result of optical inspection after EP1 As received After EP1 受け入れ段階では何も無いように見える 縦測定を行う前から結果が分かっているが、 測定結果を一度も見ずに局所研磨を行うわけにもいかないので とりあえず一回目は何もせずに測定することにする。 STF Cavity Group Meeting @2011/3/28