Presentation is loading. Please wait.

Presentation is loading. Please wait.

MHI#16号機の1回目のEP2 Process log Status of working

Similar presentations


Presentation on theme: "MHI#16号機の1回目のEP2 Process log Status of working"— Presentation transcript:

1 STF Cavity Group Meeting @2011/3/28
MHI#16号機の1回目のEP2 Process log Status of working Monitor data during EP & Rinsing process Comparison of EP2 Period : 2011/3/7 ~ 3/11 Process : EP2(20μm) under low current density, Improved 1st Water Rinsing, & Flange using FM-20, Degreasing(FM-20, 2%) [1hour], HPR x 2 [10 hours], Assembly in C.R., Vacuum evacuation, Leak check, (48hours) Preparation : Washing vacuum components with ultrasonic, Cleaning in C.R. Workers : M. Sawabe, Kirk, M. Satoh (KEK), K. Nakamura, N. Tasaki, F. Tsukada (Assist Engineering Co.), T. Okada (K-VAC), M. Asano, S. Imada (Nihon Advanced Technology) STF Cavity Group Kirk

2 Condition of EP2 & Rinsing
EP acid (2/23のサンプルを使用) Nb ingredient : 8.4g/ℓ HF ingredient : 28 g/ℓ (全体38g/ℓの65%が反応に使われる) Al ingredient : 15mg/ℓ Current density : ~37mA/cm2 (最近の傾向より) Cavity surface temperature : <35℃ Control Voltage : 温度と電流密度を見ながら制御 With normal N2 gas flow during extracting EP acid (8ℓ/min) 1st water rinsing (1.5hours) Improved version (25ℓ/minで20分間上下から流し続ける) 1分毎に1秒間水抜きを繰り返す(40分間) 最後の30分は10min (storing)/3min (flushing)で行う Degreasing (1 hour) FM-20(2%) HPR (~10 hours) 5h17m (6 turns, w/o blind flanges) 4h25m (5 turns, w/ blind flanges) EP2を1~2回行ったぐらいではたいして変化しない & Flange using FM-20 using FM-20 STF Cavity Group

3 STF Cavity Group Meeting @2011/3/28
Process log ① 3/7 16:30 Check every flange surface several scratches were found at every flange on pick-up side They were removed by polishing mechanically 3/8 10:00 10:30~ Attachment of jigs for EP 10:33 Check every flange [O.K.] / HPR operation starts without cavity 11:30 Set cavity to EP bed with crane 11:44 Installation of cathode bar to cavity [O.K.] Lunch time 13:00 Set data logger to cavity (totally 12ch) Leak check with N2 gas [O.K.] HPR operation stops for cleaning in HPR room 13:27 Meeting for tomorrow’s working procedure 14:00~ Vacuum parts rinsing with ultrasonic in C.R. 16:00 fin. STF Cavity Group

4 STF Cavity Group Meeting @2011/3/28
Process log ② 3/9 9:45 Cavity rotation starts / EP acid flow starts 10:02 EP2 starts 11:08 EP2 stops [1h06m00s] / Idling rotation (3 rpm / 20min) / Plastic case detachment 11:28 Idling rotation stops 11:30 EP acid is removed from cavity with N2 gas flow(0.020MPa) 11:43 First rinsing with ultra pure water starts 11:48 Earthquake occurred! (Level 13:13 First rinsing with ultra pure water stops [1h30m] 13:16 Detachment of restriction jigs / Data logger detached 13:36 Un-installation of cathode bar from cavity / washing cathode bar (No black mark) 13:44 transferring cavity from EP bed to wagon / Checking inside cavity [O.K.] 13:45 Detachment of jigs for EP / Detaching every blind teflon flange / Checking inside cavity [O.K.] 14:20 Brushing at every flange and HOM couplers using FM-20 / Shower rinsing 14:35 Checking inside cavity [O.K.] 14:38 Attachment of flanges for degreasing 14:46 Flowing FM-20 into cavity 14:50 Degreasing with ultrasonic starts 15:50 Degreasing with ultrasonic stops [1hour] 15:55 Removing FM-20 from cavity 16:00 Detachment of flanges for degreasing 16:06 Brushing at every flange using FM-20 / Shower rinsing STF Cavity Group

5 STF Cavity Group Meeting @2011/3/28
Process log ③ 3/9 16:25 Transferring cavity from wagon on turntable for HPR using crane 16:32 Checking tolerance between position of nozzle and center of beam pipe 16:36 1st HPR for inside cavity starts 21:53 1st HPR for inside cavity stops [5h17m] (6 turns) 22:00 Attaching only top flanges in C.R. 22:15 fin. 3/10 9:00 Attachment of blind flanges at bottom beam pipe for 2nd HPR 9:18 HPR outside cavity with blind flanges starts [15mins] 9:36 2nd HPR for inside cavity with blind flanges starts 14:01 2nd HPR for inside cavity with blind flanges stops [4h25m] (5 turns) 14:05 Cavity enters into C.R. 14:30 Assembly in C.R. (Class 10) starts 15:40 Assembly in C.R. (Class 10) finishes / Moving out from Class10 to Class1000 15:50 Vacuum evacuation starts with heat guns 16:00 Turbo pump status 100% 16:20 Leak check  Leak occurred at three ICF gaskets around bellows (Too low quality!!!)  Re-tightening screws / stop the leak / Re-leak check  O.K. 17:05 starts using new temperature controller Max Vacuum Level just after baking start : ~1.3 x 10-3Pa 18:00 Cavity vacuum : 7.13 x (Cell#3/Cell#7/Top/Bottom/Input/Probe/Room) 19:08 Cavity vacuum : 7.13 x STF Cavity Group

6 STF Cavity Group Meeting @2011/3/28
Process log ④ 3/11 8:31 Cavity vacuum : 1.93 x (Cell#3/Cell#7/Top/Bottom/Input/Probe/Room) 13:10 Cavity vacuum : 7.02 x (Cell#3/Cell#7/Top/Bottom/Input/Probe) 14:46 Big earthquake occurs! Pumping system is broken! Give up V.T.! STF Cavity Group

7 Status of 1st EP2 for MHI#16 ①
voltage Tcavity Treservoir current Troom Tcavity 平均電流密度が37mA/cm2程度になるように電圧を調整する。 (low current density EP) average current density STF Cavity Group

8 Status of 1st EP2 for MHI#16 ②
左図は平均電流密度と電圧の相関 右図は定常状態での分布 target STF Cavity Group

9 STF Cavity Group Meeting @2011/3/28
最近の定常状態の比較 Cavity Mean temp. [℃] R.M.S. temp. [℃] Mean i [mA/cm2] R.M.S. i [mA/cm2] MHI-A 1st 26.1 0.8 36.5 1.5 MHI#12 1st 25.6 0.9 34.5 1.4 MHI#13 1st 26.9 37.4 MHI#12 2nd 26.2 0.5 36.3 MHI#13 2nd 26.6 0.7 37.6 1.6 MHI#14 1st 37.3 MHI#15 1st 27.9 36.2 MHI#14 2nd 29.0 38.0 1.2 MHI#15 2nd 28.1 MHI#16 1st 27.4 1.0 電流の振れ幅は前回並みである。 振れ幅はサチり始めているか・・・ STF Cavity Group

10 Status of 1st EP2 for MHI#16 ③
#2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group Steady state:

11 Status of 1st EP2 for MHI#16 ④
#2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group

12 STF Cavity Group Meeting @2011/3/28
Status of UWR for MHI#16 ① 通信不良によるデータの跳びは非常に少ない。 #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group Steady state:

13 STF Cavity Group Meeting @2011/3/28
Status of UWR for MHI#16 ② 一次洗浄中の空洞温度の状況(前ページの拡大図) #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group

14 STF Cavity Group Meeting @2011/3/28
Status of UWR for MHI#16 ③ ①は最初の注水完了時。 ②は流量を増やした状態での洗浄中。 ③は流量を戻した状態での洗浄中。 STF Cavity Group

15 STF Cavity Group Meeting @2011/3/28
Status of HPR for MHI#16 ノズルは1st HPRでは6往復、2nd HPRでも5往復させた。 2回目はTOCメータが故障し、まともな数値を示していない。 Particleの傾向はどちらも良く似ている。 STF Cavity Group

16 Result of optical inspection after EP1
As received After EP1 受け入れ段階では何も無いように見える 縦測定を行う前から結果が分かっているが、 測定結果を一度も見ずに局所研磨を行うわけにもいかないので とりあえず一回目は何もせずに測定することにする。 STF Cavity Group


Download ppt "MHI#16号機の1回目のEP2 Process log Status of working"

Similar presentations


Ads by Google