Possible Damping Ring Timing

Slides:



Advertisements
Similar presentations
だい六か – クリスマスとお正月 ぶんぽう. て form review ► Group 1 Verbs ► Have two or more ひらがな in the verb stem AND ► The final sound of the verb stem is from the い row.
Advertisements

て -form - Making て -form from ます -form -. With て -form, You can say... ~てもいいですか? (= May I do…) ~てください。 (= Please do…) ~ています。 (= am/is/are doing…) Connecting.
Essay writing rules for Japanese!!. * First ・ There are two directions you can write. ・よこがき / 横書き (same as we write English) ・たてがき / 縦書き (from right to.
VE 01 え form What is え form? え? You can do that many things with え form?
BCD : Physics Options  e , e - e -, GigaZ, fixed target T. Omori 2005 年 12 月 20 日 BCD
Injector Linac Upgrade for SuperKEKB
高精度デジタル隔膜真空計 F-Tron High Accuracy Digital Capacitance Manometer
小水力班/ Small Hydro Generation Group 研究背景 / Research background
BT meeting (第3回) ‘04/May/11 N.Iida
All Rights Reserved, Copyright (C) Donovan School of English
第1回レポートの課題 6月15日出題 今回の課題は1問のみ 第2回レポートと併せて本科目の単位を認定 第2回は7月に出題予定
 辞書系(じしょけい).
J-PARC 実験におけるデータ収集環境とシステムデザイン
2010年7月9日 統計数理研究所 オープンハウス 確率モデル推定パラメータ値を用いた市場木材価格の期間構造変化の探求 Searching for Structural Change in Market-Based Log Price with Regard to the Estimated Parameters.
熱中性子ラジオグラフィ用-新規LiFシンチレータ、
Verb Plain Negativeform
ネットワーク構成法 スケール 第6回 11月19日.
X線モニター用ディテクター読み出し回路 フラナガン.
Solid State Transformer (SST)
SuperKEKB の入射ビーム選択と Timing 制御
日本人の英語文章の中で「ENJOY」はどういうふうに使われているのか
Japanese verbs informal forms
INSERTを高速化したPostgreSQL
SP0 check.
Tohoku University Kyo Tsukada
SuperKEKBに向けた電子・陽電子入射器Linac用ビーム位置モニターの読み出しシステム開発
CDMA Technologies for Cellular Phone System
Measurement and Compensation of Lorentz Detuning at STF Phase-1.0
Chapter 4 Quiz #2 Verbs Particles を、に、で
定期考査2 英語.
The Sacred Deer of 奈良(なら)
Possible Damping Ring Timing
On / in / at Honoka Tanno.
Second RF-Gun beamline
MPPCのlinearity測定 2015/02/04  栁田沙緒里.
SksMinus status 20 HB meeting 2009/2/16 白鳥昂太郎.
ストップウォッチの カード ストップウォッチの カード
CYRIC Hyperball2 technical memo
Topics on Japan これらは、過去のインターンが作成したパワポの写真です。毎回、同じような題材が多いため、皆さんの出身地等、ここにない題材も取り上げるようにしてください。
2018/11/19 The Recent Results of (Pseudo-)Scalar Mesons/Glueballs at BES2 XU Guofa J/ Group IHEP,Beijing 2018/11/19 《全国第七届高能物理年会》 《全国第七届高能物理年会》
STFでの量子ビーム実験セットアップ概念図
Shigeru KASHIWAGI (ISIR, Osaka Univ.)
Timing/Controls for Pulse-to-pulse Beam Switch
Kazuro Furukawa Linac 制御 Group
古川和朗、船越義裕、菊池光男、菊谷英司、生出勝宣、 佐藤政則、中村達郎、末竹聖明、諏訪田剛、矢野喜治 高エネルギー加速器研究機構 (KEK)
DR Monitorに必要なタイミング・ネットワークその他
Damping ring単独運転用 Bucket Selectionサブルーティンについて
測定結果(9月) 2005年10月7日.
-Get test signed and make corrections
My Favorite Movie I will introduce my favorite movie.
Where is Wumpus Propositional logic (cont…) Reasoning where is wumpus
Timing for PF Injection from GU_A1
ATLAS実験におけるシミュレーションを用いたエンドキャップトリガーの性能評価
著者:大内和夫 著者:大内和夫 著者:大内和夫 著者:大内和夫 著者:大内和夫 著者:大内和夫.
2019/4/22 Warm-up ※Warm-up 1~3には、小学校外国語活動「アルファベットを探そう」(H26年度、神埼小学校におけるSTの授業実践)で、5年生が撮影した写真を使用しています(授業者より使用許諾済)。
M. Uchida, Kyoto University
Genetic Statistics Lectures (4) Evaluation of a region with SNPs
ALICE work at CERN Kenta Mizoguchi, Hisayuki Torii, Yusuke Okada
大強度ビームにふさわしい実験装置をつくろう Kenichi Imai (JAEA)
ビームラインイオン光学 Yoshiko Sasamoto Goal : 最高分解能を実現 そのためには、現状の認識.
非等方格子上での クォーク作用の非摂動繰り込み
Cluster EG Face To Face meeting
4リング同時入射 M. Satoh (KEK Acc. Linac Control/ Commissioning G.)
Measurements of J/ψ with PHENIX Muon Arms in 2003 p+p Collisions
COMET Beam Extinction計測速 報
Goal: I can understand more about the Japanese art of complaining
香港常見的食用魚 Random Slide Show Menu
アノテーションガイドラインの管理を行う アノテーションシステムの提案
Improving Strategic Play in Shogi by Using Move Sequence Trees
Timing/Controls for Pulse-to-pulse Beam Switch
Presentation transcript:

Possible Damping Ring Timing Kazuro Furukawa Injector Linac, KEK <kazuro.furukawa@kek.jp> Oct.27 の報告に、一部書き足し (Oct.28)、さらに書き足し (Nov.1) Event system 関連の情報は、次の URL <http://www-linac.kek.jp/cont/epics/event/> <http://www-linac.kek.jp/cont/trigger/index2.html>

Bucket selection in Phase-2 with DR DR timing Bucket selection in Phase-2 with DR Without DR, simply wait up to 5120 x 96 ns ~ 490 μs 96 ns : highest common frequency between linac – ring With DR, in order to select arbitrary bucket in MR, have to wait up to ~4.5 ms, even if a bucket in DR was carefully selected Power supply can wait only 2 ms, one of only 2798 buckets in 5120 buckets can be selected, may have to change LLRF condition at latter half of linac every pulse Can be a big challenge in LLRF precision e− Gun KEKB ARC Primary e– (3.5GeV, 10nC) e+ BT (3.5GeV, 0.6nC) e+ Target 96ns >100ns e+ DR (1.1 GeV, 4nC) e− Gun SuperKEKB ARC Primary e– (3.5GeV, 10nC) e+ BT (KEKB: 4GeV, 4nC) e+ Target

Memo from Oct.6.2016 32k 周 14ms 分記録 読み出しは 12 枚で 0.5秒 2ns または 4ns step Bunch 同期信号、入射 Kicker を打ってから Revolution で Timing を打ち続ける 20% の Duty 比、TTL 入射 Kicker が打ったらそれに同期する、つまり 2 pulse 溜めたときには、最初の pulse は無視 ??? Start 信号、入射 Kicker から、(NIM)/TTL さらに Revolution を一ヶ所 2 種類 一つは MR RF から作った DR Revolution と DR RF から作った DR Revolution の 2 つ 入出射 Kicker / BPM EVR で一方の Revolution を作れば良い 15 slot VME64x x2箱 Dispersion 測定のために 509 MHz を振る +/- 50kHz そのため、Linac 同期の 509 MHz/Revolution は使えない おそらく Main event system とは切り離した Event system または新規開発信号分配 System が必要 Dispersion 測定後に出射 Kicker を同期できるか不明 その場合はその独立 Event System 側が出射 Kicker を打つ 出射 Kicker 側は 親 Event system と独立 Event system の双方から Kicker signal を受ければ良い

Distributed bus and multiplexed counters The distributed bus allows transmission of eight simultaneous signals with the event clock rate time resolution (10 ns at 100 MHz event clock rate). The source for distributed bus signals may come from an external source or the signals may be generated with programmable multiplexed counters (MXC) inside the event generator. The distributed bus signals may be programmed to be available as hardware outputs on the event receiver.

MXC and Sequencer The end sequence code 0x7f resets the sequencer RAM table address and timestamp register and depending on configuration bits, disables the sequencer (single sequence, SQxSNG=1) or restarts the sequence either immediately (recycle sequence, SQxREC=1) or waits for a new trigger (SQxREC=0).

信号の生成 入出射 System 用の Beam 同期信号は、Linac 内の信号と同等に生成することができる(Kicker、BT BPM、など) 入射用・出射用の信号は Linac の上流・下流の Event に直接接続する Beam に同期しない Revolution 信号は Multiplexed counter (MXC) で生成し、Distributed bus で分配することができる (RF group も作ってくれるらしい) Harmonic number 230 と同期するために Prescaler 値は 5 または 10 MR RF 同期と DR RF 同期の双方が必要らしい BPM 用の信号(Beam 同期の Revolution 信号)は MXC では作れない、例えば Sequencer に生成させることができると思われる 適当な長さの Event 列を Sequencer に書き込み、Recycle させる Event clock と Beam bucket の Offset を Bucket number から計算しておき、EVR の出力 Delay を Pulse 毎に調整する Dispersion 測定後に MR RF 同期と DR RF 同期の Revolution 信号を同期させる仕組みが必要か

Event Modules

Event Modules 宮原氏の Slide と池田さんから情報を追加

Pulse-to-pulse modulation ARC e– (2.5GeV, 0.2nC) e− Gun e+ Target e+ (4GeV, 4nC) PF Injection SuperKEKB-LER Injection e– (3.5GeV, 10nC) e– (7GeV, 5nC) SuperKEKB-HER Injection e– (6.5GeV, 5nC) PF-AR Injection Damping ring Event-based Control System Every 20 ms F.B Four PPM virtual accelerators for SuperKEKB project Based on Dual-tier controls with EPICS and event-system Independent parameter sets for each VA (20ms) >200 parameters for equipment controls many more for beam controls maybe with additional PPM VA of stealth beam for measurement